Nautical Structures Crane Overhaul - 70' Realship

A Nautical Structures 2500lb Davit was completely stripped down to bare metal and components.   The metal parts were then sand blasted, primed and finished with DuPont product paints.  The electrical components were completely rewired as well as a wireless remote installed.  New hydraulic lines were fabricated in house and installed. The cylinders were resealed and a new stainless cable was added.  The result was a like new unit with wireless remote feature at a cost much less than replacing with a new Crane.  The project was completed with a custom fabricated Davit cover.